Description

The yard for the realization of the so-called Central ” Circuit ” is active. The opening of the construction site and then the beginning of the real work was preceded by a long and careful preparation phase useful for a thorough study on the existing aqueduct system, water resources and population, current and future, and consequent consumption evaluations. The distribution of water produced by the Central Water Management is scheduled via pipelines connecting the various water supply systems: to facilities of the Pineta, Pergole and Bosso, to be laid from the plant compressor station, along the provincial road to the bridge Bagnone for about 800 meters. Concurrently it is provided a sewer that connects to the existing collection and treatment system.

Project

Water Purification Plant

Role

Plant Construction